Below are some of the issues that were resolved during the design coordination BIM process. The designers are only focusing on the large items of the MEPF systems. Anything smaller than 4 inch pipe will be the responsibility of the genaral contractor with their MEP subs to populate the BIM and coordinated for interference.
|